For the second time in two years we are looking forward to be able to deliver a further turbine to the woodwork in Grassellenbach. Delivered in December 2019, the turbine with an electrical power of 710KW will be used in the family business in South Hesse. Technical highlights are the nine-stage rotor with a controlled extraction for district heating. Because the turbine will be used twice: to increase the electrical use of a steam engine and for the own use of the district heating. This results in the two included capacitors (heating and vacuum condenser). More Information about the Holzwerk Grasellenbach can be found here