Referenzbericht
Ekokem Corporation
New power plant line for existing special waste incinerator
Waste
Finland
10.6 MW
2012
The company Ekokem is a large North European company which originally specialised in the disposal of toxic waste but has meanwhile transformed itself into a Circular Economy company which provides total waste management and recycling services. Ekokem is committed to the recycling of natural resources and the environmentally responsible handling of waste disposal.
In a new power generation facility of an existing waste-fuelled power station in the Finnish town of Riihimäki, the heat and power produced is to be fed into the town mains network. The energy generated by the process is thereby fed into the Riihimäki mains network which contributes to a decentralised energy supply system.
Turbine Parameters:
Power Range:
10.6 MW
Speed:
6190 rpm
Inlet Pressure:
26 bar abs
Inlet Temperature:
320 °C
Exhaust Pressure:
0.75 bar abs
“The collaboration with M+M was shaped by a purposeful and cooperative approach whereby M+M has always acted in a target orientated and problem solving-competent manner.“
Janne Huovinen, Technical manager, Ekokem Corporation
Das Ziel:
The condensing steam turbine should, over the year, cover the varying district heating requirement and generate a peak of up to 10.6 MW of power and 44.5 MW of heat. The contract for the steam turbine was awarded as the result of a call for tenders which we successfully won against our international competitors.
The customer specifications, such as the plant equipment, the measurement technology, the scope of testing and the requirements on documentation benefited our company as we specialise in the implementation of custom built requirements.
We achieved the customer requirement for a high level of cycle efficiency in different load ranges by means of steam extraction using a three-stage uncontrolled bleed point.
Unsere Lösung nach Maß:
The condensing steam turbine should, over the year, cover the varying district heating requirement and generate a peak of up to 10.6 MW of power and 44.5 MW of heat. The contract for the steam turbine was awarded as the result of a call for tenders which we successfully won against our international competitors.
The customer specifications, such as the plant equipment, the measurement technology, the scope of testing and the requirements on documentation benefited our company as we specialise in the implementation of custom built requirements.
We achieved the customer requirement for a high level of cycle efficiency in different load ranges by means of steam extraction using a three-stage uncontrolled bleed point.
Der Projektverlauf:
Close cooperation was particularly important in this project. During regular progress meetings held almost monthly in Finland, good and professional collaboration with the customer and planners succeeded in the perfect integration of all the components of the comprehensive scope of supply. Close contact with the customer then also led to handover exact to the day after a 4 week uninterrupted trial run and the successfully passed performance test.
“It was a real pleasure to work, through the whole project, from early quotation stage to final commissioning, with real professionals from M+M Turbinen-Technik.“
Jack Mannila, Managing director, Sondex Tapiro OY AB
Aktueller Stand:
The turbine has been running smoothly since its commissioning at the end of 2012.